Discussions about thermal pad selection often start with "how many watts per metre-kelvin do we need". In practice, the thermal result is determined by every link in the heat path: source power, allowable temperature rise, assembly gap, structural strength and downstream processing. Skip any one of them and a material with a higher nominal conductivity may still underperform in the assembled product.
The four-step method below is a general approach drawn from thermal simulation work in our materials laboratory and from prototyping on the production line, intended to help engineers align early in the design phase. All parameter ranges in this article are subject to the actual test report; specific grades and availability are subject to commercial confirmation.
Conclusion: the starting point is not thermal conductivity, but "how many watts must be moved within how much temperature rise budget".
Write down three numbers first: the actual power of the heat source (W, distinguishing continuous from peak), the allowable temperature difference from source to ambient (ΔT, derived from the device temperature specification and the system derating requirement), and the interface area through which heat flows (mm2). With these three, the required interface thermal resistance can be quantified, and the necessary conductivity and thickness derived from it.
Boundary conditions: where heat sink area is sufficient and the airflow path is reasonable, raising conductivity beyond 3.0 W/(m·K) usually improves temperature rise less than improving interface wetting and reducing contact resistance. Where the heat source area is small and heat flux is high, increasing conductivity shows a more visible marginal benefit. Thermal conductivity is a necessary condition, not a sufficient one.
Conclusion: the design thickness should be "measured maximum gap + tolerance allowance", not the nominal gap.
Measure on a small batch of prototypes that are close to production condition: record the maximum, minimum and distribution of the gap between the heat sink surface and the chip or housing. Tolerance comes from part flatness, screw torque, snap-fit deformation and soldering warpage — items that are rarely visible on drawings and can only be measured.
Boundary conditions: when the compression ratio is below 10%, the interface is difficult to wet out fully and the reduction in thermal resistance is limited; when it exceeds 50%, resilience stress rises and the risk of permanent deformation after long-term compression increases, depending on formulation and operating temperature, subject to the actual test report. Conversely, if a pad is barely compressed after assembly, a high nominal conductivity will not translate into the expected thermal performance in the finished product.
Conclusion: structural strength sets the upper limit of hardness; interface wetting sets the lower limit.
Start with the load-bearing structure. A metal housing with screw fastening can accept higher hardness (toward the upper end of Shore C 10–50); the pad is less likely to be squeezed out and dimensional stability is better. Plastic snap-fits, thin-wall parts or long-span covers have limited fastening force and suit the lower hardness range (toward the lower end of Shore C 10–50), trading a smaller assembly force for a larger contact area.
Then look at the interface condition. Where the heat sink surface has tool marks, silkscreen, steps or slight warpage, a softer material fills microscopic voids more readily, in most cases resulting in lower contact resistance.
Boundary conditions: low-hardness materials involve a trade-off between gap filling and extrusion resistance; with thick layers (for example above 5.0 mm) combined with low hardness, evaluate sag, displacement and long-term compression set at the same time. Higher-hardness materials place stricter demands on flatness and fastening force. Hardness should be selected within the Shore C 10–50 range against actual structural conditions, subject to the actual test report.
The same formulation can behave very differently on the assembly line depending on downstream processing. Clarify the following at quotation stage:
The earlier these points are confirmed, the less likely a rework where the thermal parameters are correct but the part cannot be assembled.
Work through the four steps in order: quantify power and temperature rise, measure gap and tolerance, set hardness and compression from structural strength, then lock the downstream requirements. Once these are done, the specification range is usually narrow enough to move to prototyping.
The more complete the information, the fewer iteration rounds are needed for specification matching and prototype validation. All parameter ranges in this article are subject to the actual test report; specific grades and availability are subject to commercial confirmation.
More notes like this one, plus full model parameters and answers to common selection questions. Send us your operating conditions and our engineers will come back with a model recommendation.
WeChat ID 422090666 | Email zt.xu@fz-rbh.cn
Engineer Discussion
A space for engineers to exchange operating conditions, structural constraints and selection experience. Publicly shareable technical conditions such as source power, assembly gap, fastening method and shielding requirements are welcome; discussing where the boundaries lie helps everyone. Please do not post confidential information: drawings, customer names, BOM details, unpublished specifications and test data should not be shared. Our replies are technical reference only and do not replace your own validation and test conclusions.
Comment Guidelines
The comment module will be enabled once the GitHub repository configuration is complete. Until then, please reach us through the channels below.